Funder
National Research Foundation of Korea
Ministry of Education
Subject
Applied Mathematics,Discrete Mathematics and Combinatorics
Reference15 articles.
1. Just-in-time scheduling with periodic time slots;Cepek;Sci. Math. Jpn.,2004
2. A heuristic algorithm for one-machine just-in-time scheduling problem with periodic time slots;Chiba;Commun. Comput. Sci.,2005
3. Just-in-time scheduling with generalized due dates and identical due date intervals;Choi;Asia-Pacific J. Oper. Res.,2018
4. Strong NP-hardness of minimizing total deviation with generalized and periodic due dates;Choi;Oper. Res. Lett.,2019
5. Unary NP-hardness of minimizing total weighted tardiness with generalized due dates;Gao;Oper. Res. Lett.,2006
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献