Subject
Applied Mathematics,Discrete Mathematics and Combinatorics
Reference14 articles.
1. M.S. Akturk, J.B. Ghosh, E.D. Gunes, Scheduling with tool changes to minimize total completion time, Technical Report, Department of Industrial Engineering, Bilkent University, Ankara, Turkey, 1999.
2. Scheduling with tool changes to minimize total completion time: a study of heuristics and their performance;Akturk;Naval Res. Logistics,2003
3. Scheduling with tool changes to minimize total completion time: basic results and SPT performance;Akturk;European J. Oper. Res.,2004
4. Minimizing job tardiness using integrated preventive maintenance planning and production scheduling;Cassady;IIE Trans.,2003
5. Minimizing total flow time in the single-machine scheduling problem with periodic maintenance;Chen;J. Oper. Res. Soc.,2006
Cited by
34 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献