1. Geotechnical feasibility study into rock cavern construction in the Bukit Timah Granite. Consultants report;Arup & Partners International,1993
2. Potential pumped storage projects that could use existing reservoirs;Stout,1974
3. Evaluation of load management effects on energy cost;Teo,1986
4. Hydropower Engineering;Warnick,1983
5. A feasibility study of underground caverns construction and utilization in Singapore, Part B: Costs, Utilization and Planning;Zhao;Tunnelling and Underground Space Technology,1994