1. Autio, J., 1996. Characterization of the excavation disturbance caused by the boring of the experimental full scale deposition holes in the Research Tunnel at Olkiluoto. Report POSIVA-96-09, Posiva Oy, Helsinki and similar report TR 97-24 in SKB's report series.
2. Autio, J., Kirkkomäki, T., 1996. Boring of full scale deposition holes using a novel dry blind boring method. Report POSIVA-96-07, Posiva Oy, Helsinki and similar report TR 96-21 in SKB's (Svensk Kärnbräslehantering) report series.
3. Hartikainen, J., Hartikainen, K., Pietarila, H., Timonen, J., 1995. Permeability and diffusivity measurements with the He-gas method of excavation disturbed zone in rock samples cored from the full-scale experimental deposition holes in the TVO Research Tunnel. Report YJT-95-16, Nuclear Waste Commission of Finnish Power Companies, Helsinki and similar report PR D-95-018 in SKB's report series.
4. Hartikainen, J., Hartikainen, K., Hautojärvi, A., Kuoppamäki, K., Timonen, J., 1996. Helium gas methods for rock characteristics and matrix diffusion. Report Posiva-96-22. Posiva Oy, Helsinki.
5. Study of porosity and migration pathways in crystalline rock by impregnation with 14C-polymethylmethacrylate;Hellmuth;Journal of Contaminant Hydrology,1993