1. Colesanti, C., Ferretti, A., Perissin, D., Prati, C., Rocca, F., 2003. Evaluating the effect of the observation time on the distribution of SAR permanent scatterers. In: Proceedings of FRINGE 2003, Frascati, Italy, 1–5 December, ESA SP – 550.
2. Detection ground settlement of Shanghai using interferometric synthetic radar (InSAR) techniques;Damoah-Afari;The International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences,2008
3. Damoah-Afari, P., Ding, X., Lu, Z., Li, Z.W., Omura, M., 2007. Six years of land subsidence in Shanghai revealed by JERS-1 SAR data. In: Sensing and Understanding Our Planet, International Geoscienc and Remote Sensing Symposium 2007 (IGARSS07). Barcelona, Spain, 23–27 July, p. 5 (on CD-ROM).
4. On construction technique of soft soil shield cutting directly reinforce concrete pile foundation;Fu;China Municipal Engineering,2010
5. Higher-order permanent scatterers analysis;Ferretti;EURASIP Journal on Advances in Signal Processing,2005