1. Cyclic response of precast concrete shear walls with reduced grouted sleeves or corrugated metallic duct splices;Xue;Case Stud. Constr. Mater.,2023
2. Numerical study on the influence of geometric parameters on mechanical properties of tapered head grouted sleeve joints;Chen;Case Stud. Constr. Mater.,2022
3. Bond behavior of spirally confined splice of deformed bars in grout;Hosseini;Constr. Build. Mater.,2015
4. Study of effects of sleeve grouting defects on the seismic performance of precast concrete shear walls;Xiao;Eng. Struct.,2021
5. Development and validation of a defect detection and repair method for half grouted sleeve connection;Xie;Case Stud. Constr. Mater.,2022