1. Characteristics of subsidence of a road during the new tubular roof construction around a shallow tunnel;Kim;Tunn. Undergr. Space,2018
2. Monitoring and controlling on surface settlement in sand and gravel strata caused by subway station construction applying pipe-roof pre-construction method (PPM);Yang;Civ. Eng. J.,2017
3. Study on the effect of parallel pipe jacking spacing on surface subsidence deformation in the pre;Jie;IOP Conf. Ser.: Mater. Sci. Eng.,2020
4. The prediction of ground settlement of a box culvert jacked under the action of an ultra-shallow buried pipe curtain;Hao;Arab J. Sci. Eng.,2022
5. Prediction method for surface settlement in tunnel construction with pipe curtain support;Jiang;Mod. Tunn. Technol.,2020