Author:
Tahiri Mohamed,Khamlichi Abdellatif,Dkiouak Rachid,Bezzazi Mohammed
Reference48 articles.
1. Dynamic behaviour of ballast on railway bridges. Dynamics of high speed railway bridges;Zacher,2008
2. ERRI D214, Rails bridge for speed>200km/h. final report. Part A. Synthesis of the results of D214 research. European Rail Research Institute. 1999.
3. Train-track-bridge dynamic interaction: a state-of-the-art review;Zhai;Veh Syst Dyn,2019
4. Martinez-Rodrigo M.D., Galvin P., Moliner E., Romero A. Rail-bridge interaction effects in single-track multi-span bridges. Experimental results versus numerical predictions operating conditions. EURODYN 2020, XI International Conference on Structural Dynamics.
5. CEN, EN 1991–2:2012–03-01, Eurocode 1: Actions on structures – Part 2: Traffic loads on bridges. Brussels: European Committee for Standardization; 2003.