1. New study shows why fixed platforms fail during storm;Cooper;Oil Gas J,1967
2. Design of tubular joints for offshore structures;UEG,1985
3. Recommended practice for planning, designing and constructing fixed offshore platforms-working stress design,2000
4. Petroleum and Natural gas industries—offshore structures—part 2: fixed steel structures,2007
5. Design guide for circular hollow section (CHS) joints under predominantly static loading;Wardenier,1991