1. How does the European recovery target for construction & demolition waste affect resource management?;Arm;Waste Biomass Valor,2016
2. Arnold, J.C., Nölting, M., Riebesehl, G., Denck, C., 2012. Unlocking the full potential of reclaimed asphalt pavement (RAP) – High quality asphalt courses incorporating more than 90% RAP; a case study. In: 5th Eurasphalt & Eurobitume Congress, 13–15th June 2012, Istanbul. Downloaded from: http://www.eecongress2012.org/E&E_2012_List_of_papers_per_session.pdf.
3. Mass balance and life cycle assessment of the waste electrical and electronic equipment management system implemented in Lombardy Region (Italy);Biganzoli;Sci. Total Environ.,2015
4. Recycling techniques and environmental issues relating to the widening of an high traffic volume Italian motorway;Bocci;J. Pavement Res. Technol.,2010
5. Life cycle assessment of non-hazardous construction and demolition waste (CDW) management in Lombardy region (Italy);Borghi;J. Clean. Prod.,2018