Author:
Xu Zhengming,Song Xianzhi,Li Gensheng,Wu Kan,Pang Zhaoyu,Zhu Zhaopeng
Funder
Science Fund for Creative Research Groups of the National Natural Science Foundation of China
National Natural Science Foundation of China
National Science and Technology Major Project of China
National Key Research and Development Program of China
State Scholarship Fund
Subject
Industrial and Manufacturing Engineering,Energy Engineering and Power Technology
Reference59 articles.
1. Early kick detection and well control decision-making for managed pressure drilling automation;Karimi Vajargah;J. Nat. Gas Sci. Eng.,2015
2. Schlumberger Oilfield Glossary, http://www.glossary.oilfield.slb.com/Terms/k/kick.aspx.
3. Models for dynamic kill of blowouts;Ravndal,2011
4. I.S. Sutton, Summarizing the deepwater horizon/Macondo reports, in: Offshore Technology Conference, Offshore Technology Conference, Houston, Texas, USA, 2013.
5. Transient simulation of the blowing-out process of the air pockets in vertical wellbore;Xie;Appl. Therm. Eng.,2014
Cited by
44 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献