1. Raw material release rates to ensure desired production lead time in Bernoulli serial lines;Biller;International Journal of Production Research,2013
2. Production Systems Engineering;Li,2009
3. Meerkov, S.M. and Yan, C.B. (2015a). Cellular production lines with asymptotically reliable Bernoulli machines: Lead time analysis and control. Accepted for publication in IEEE Transactions on Automa,tion Science and Engineering.URL http://ieeexplore.ieee.org/xpl/articleDetails.jsp?arnumber=6853412&filter%3DAND(p_IS_Number%3A4358066)%26pageNumber%3D3.
4. A method for “sweet point” operation of re-entrant lines;Meerkov,2015
5. Production lead time in serial lines: Evaluation, analysis, and control;Meerkov,2015