1. Genetic algorithm for the traveling salesman problem using sequential constructive crossover operator;Ahmed;International Journal of Biometrics & Bioinformatics (IJBB),2010
2. A survey of scheduling problems with setup times or costs;Allahverdi;European Journal of Operational Research,2008
3. Inventory control in a multi-supplier system;Arda;International Journal of Production Economics,2006
4. Continuous review inventory models where random lead time depends on lot size and reserved capacity;Çakanyildirim;International Journal of Production Economics,2000
5. Performance analysis model for systems described by renewal process;Dolgui;Engineering Simulation,2002