1. 3dlasermapping. (2015). ZEB1. Retrieved Oct 12, 2015, http://www.3dlasermapping.com/zeb1-indoor-mapping/.
2. Early Stakeholder Involvement in the Project Definition Phase: Case Renovation;Aapaoja;ISRN Industrial Engineering,2013
3. AFNOR. (2007). NF X50-501.
4. AFNOR. (2010). NF EN 13306.
5. Ahmad, A. M. (2014). The Use of Refurbishment, Flexibility, Standardisation and BIM to Support the Design of a Change-Ready Healthcare Facility. Retrieved Feb 3, 2016 https://dspace.lboro.ac.uk/dspace-jspui/handle/2134/14907.