Author:
Ilmer Quirin,Haeussler Stefan,Missbauer Hubert
Subject
Control and Systems Engineering
Reference11 articles.
1. Steel scheduling optimization for ipsco’s rolling mill and reheat furnace;Assaf;In IEEE WESCANEX 95. Communications, Power, and Computing. Conference Proceedings,1995
2. A paradigm for the scheduling of a continuous walking beam reheat furnace using a modified genetic algorithm;Broughton;Materials and Manufacturing Processes,2007
3. Production scheduling optimization algorithm for the hot rolling processes;Chen;International Journal of Production Research,2008
4. Hu, R., Yang, S., and Luo, X. (2014). Ant colony optimization for scheduling walking beam reheating furnaces. In Proceeding of the 11th World Congress on Intelligent Control and Automation, 621–626. doi: 10.1109/WCICA.2014.7052786.
5. A multi-objective optimisation algorithm for the hot rolling batch scheduling problem;Jia;International Journal of Production Research,2013
Cited by
6 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献