Author:
Sobaszek Łukasz,Gola Arkadiusz,Kozłowski Edward
Subject
Control and Systems Engineering
Reference20 articles.
1. A two-stage artificial bee colony algorithm scheduling flexible job-shop scheduling problem with new job insertion;Kai;Expert Systems with Applications,2015
2. The robust single machine scheduling problem with uncertain release and processing times;Umang,2014
3. Gola A. (2019). Reliability analysis of reconfigurable manufacturing system structures using computer simulation methods. Eksploatacja i Niezawodnosc – Maintenance and Reliability, 21(1), 2019, pp. 90–102. doi: http://dx.doi.org/10.17531/ein.2019.1.11. Unpublished.
4. Sitek, P., Wikarek, J., Nielsen, P. (2017). A constraint-driven approach to food supply chain management. Industrial Management & Data Systems, Vol. 117, Issue: 9, pp. 2115–2138. doi: https://doi.org/10.1108/IMDS-10-2016-0465
5. Comparison of dispatching rules in job-shop scheduling problem using simulation: a case study;Kaban;International Journal of Simulation Modelling,2012
Cited by
4 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献