Author:
Baybulatov A.A.,Promyslov V.G.
Subject
Control and Systems Engineering
Reference18 articles.
1. Fundamental Concepts of Dependability;Avizienis,2000
2. Industrial Control System Availability Assessment with a Metric Based on Delay and Dependency;Baybulatov;IFAC-PapersOnLine,2021
3. Baybulatov, A.A. and Promyslov, V.G. (2022). Industrial Control System Cybersecurity Assessment Handling Delay Estimation. In: Radionov, A.A. and Gasiyarov, V.R. (eds.) Advances in Automation III. RusAutoCon 2021. Lecture Notes in Electrical Engineering, vol. 857. Springer, Cham. p. 462-473.
4. On ICS Cybersecurity Assessment with the Help of Delay Calculation;Baybulatov,2021
5. Cyber Security Metrics and Measures;Black;Wiley Handbook of Science and Technology for Homeland Security,2008
Cited by
5 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. Flexible Modeling System: Steam Generator Level Calculation;2023 16th International Conference Management of large-scale system development (MLSD);2023-09-26
2. Flexible Modeling System: Steam Generator Model;2023 International Russian Automation Conference (RusAutoCon);2023-09-10
3. Cyber hardening of Nuclear Power Plants with real-time nuclear reactor operation, 1. Preliminary operational testing;Progress in Nuclear Energy;2023-08
4. Loss and premium calculation of network nodes under the spread of SIS virus;Journal of Intelligent & Fuzzy Systems;2023-05-04
5. On the Availability Property and Its Metric for NPP IACS;2022 15th International Conference Management of large-scale system development (MLSD);2022-09-26