Author:
Mouayni I. El,Demesure G.,Haouzi H. Bril-El,Charpentier P.,Siadat A.
Subject
Control and Systems Engineering
Reference24 articles.
1. Multi-machine earliness and tardiness scheduling problem: an interconnected neural network approach;Akyol;Int. J. Adv. Manuf. Technol.,2008
2. Development and applications of holonic manufacturing systems: a survey;Babiceanu;J. Intell. Manuf.,2006
3. Buzacott, J.A., 2002. The impact of worker di!erences on production system output 8.
4. Chen, Z.-L., 2000. Scheduling Multiple Families of Jobs on Parallel Machines to Minimize Total Weighted Completion Time. IEEE Real Time Technology and Applications Symposium 20.
5. Minimizing makespan on a two-machine re-entrant flowshop;Choi;J. Oper. Res. Soc.,2007
Cited by
12 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献