Author:
Ramya G.,Chandrasekaran M.,Arulmozhi P.
Reference17 articles.
1. R.Kollura et. al. (2000),“ A framework for the development of agile manufacturing enterprise”, Proceeding of the 2000 IEEE international conference on Robotics and Automation, San Francisco, CA, April 2000, Vil.2, PP 1132-1137
2. Peter Brucker, (2006),“Scheduling algorithms”, Fifth Edition.
3. Alper Turkyilmaz et. al. (2020), “A research survey heuristic approaches for solving multi objective flexible job shop problems”, Journal of intelligent manufacturing, Springer.
4. Integrated production planning and scheduling optimization of multisite, multiproduct process industry;Shah;Comput. Chem. Eng.,2012
5. Solving the Integrated Lot-Sizing and Job-Shop Scheduling Problem;Urrutia;Int. J. Prod. Res.,2014
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献