1. Energy reduction initiatives to improve low amperage cell performance. Travaux 46;Gupta,2017
2. Surviving an extended power outage after a breakdown in the sub station. Travaux 46;Düssel,2017
3. Restart of 100 kA VSS pot-lines after long shutdown;Agrawal,2002
4. Key improvements to Hall-Heroult since the end of World War II;Grjotheim;J. Met.,1995
5. Pot voltage management resistance target settingand modifieres;Lopez,2000