1. Multi-Sample Image-based Material Recognition and Formalized Sequencing Knowledge for Operation-Level Construction Progress Monitoring;Kevin;Computing in Civil and Building Engineering,2014
2. n Automated construction progress measurement using a 4D building information model and 3D data;Kim;Automation in Construction, Elsevier B.V.,2013
3. Managing Software Development Projects for Maximum Productivity;Howes;IEEE Trans. Software Eng.,1984
4. Minimum performance bounds for evaluating contractor's performance during construction of highway pavement projects;Aziz;Construction Management and Economics,2008
5. Breunig, M. M., Kriegel, H., Ng, R. T., and Sander, J. (2000). “LOF : Identifying Density-Based Local Outliers.” 65(1), 93–104. https://doi.org/10.1145/335191.335388