Author:
Nath Udit Kumar,Jagadev Alok Kumar,Pattnaik Prasant Kumar
Reference25 articles.
1. S. Alam, “An Innovative Project Management System,” 2019 International Conference on Information Management and Technology (ICIMTech), Jakarta/Bali, Indonesia, 2019, pp. 180-185, doi: 10.1109/ICIMTech.2019.8843768.
2. L. van Moergestel et al., “A Versatile Simulation Model of Agile Production by Autonomous Systems,” 2017 IEEE 13th International Symposium on Autonomous Decentralized System (ISADS), Bangkok, 2017, pp. 77-83, doi: 10.1109/ISADS.2017.54.
3. Dynamic Software Project Scheduling through a Proactive-Rescheduling Method;Shen;IIEEE Trans. Software Eng.,2016
4. Improved Mean and Variance Estimating Formulas for PERT Analyses;Kim;IEEE Trans. Eng. Manage.,2014
5. A simulation study of practical methods for technical debt management in agile software development;Griffith,2014