Author:
Dhanasakkaravarthi B.,Krishnamoorthy A.
Reference22 articles.
1. A.K. Rinnooy Kan. (1976). Machine scheduling problems: classification, complexity, and computations. PhD thesis, University of Amsterdam.
2. S.M. Johnson. (1954). Optimal two‐and three‐stage production schedules with setup times included. Naval research logistics quarterly, 1(1), 61-68.
3. D.S. Palmer. (1965). Sequencing jobs through a multi-stage process in the minimum total time—A quick method of obtaining a near optimum. J. Operat. Res. Soc., 16(1), 101-107.
4. A heuristic algorithm for the n job, m machine sequencing problem;Campbell;Manage. Sci.,1970
5. An evaluation of flow shop sequencing heuristics;Dannenbring;Manage. Sci.,1977