1. Productivity performance of the construction sector;Ismail;Malaysian Construct. Res. J. (MCRJ),2007
2. The World Bank. (December 18, 2007). Pakistan Infrastructure Implementation Capacity Assessment. Pakistan: South Asia sustainable development unit.
3. I.R. Endut, A. Akintoye, J. Kelly, Cost and Time Overrun Projects in Malaysia. Retrieved from, 2009. http://www.irbnet.de/daten/iconda/CIB10633.pdf.
4. Root cause analysis for cost overrun;Rosenfeld;J. Construct Eng. Manage.,2014
5. Effect of construction delays on project time overrun: Indian scenario;Salunkhe;IJRET: Int. J. Res. Eng. Technol.,2014