1. Experimental settlement and dynamic behavior of a portion of ballasted railway track under high speed trains;Al-Shaer;Journal of Sound and Vibration,2008
2. Research on the track irregularity of ballastless track in the comprehensive experimental section of Suining–Chongqing railway line;Cai;Journal of Railway Engineering Society,2009
3. Analysis of the dynamic performance for slab track settlement on embankment;Han;Journal of Railway Engineering Society,2007
4. Theory of ballastless track-subgrade for high speed railway;Hu,2010
5. Analysis on distribution of dynamic stresses of ballastless track-subgrade surface under axle loading of vehicle;Huang;Journal of the China Railway Society,2010