1. Visual floodplain modeling with Geographic Information Systems (GIS);Anrysiak,2000
2. Abu Hassan, Z., 1998. Evaluation of scour and deposition in Malaysian rivers undergoing training works: case studies of Pari and Kerayong Rivers, MSc thesis, University of Science Malaysia.
3. Ab.Ghani, A., Abu Hasan, Z., Abdullah, R., & Zakaria, N.A., 1998. Scour and deposition in Pari River after the completion of flood mitigation project. International Conference On Hydrology and Water Resources of Humid Tropics, Perak (Humid Tropics’98), Malaysia.
4. Ab.Ghani, A., Sinnakaudan, S., S. Ahmad, M.S., Zakaria, N.A., Abdullah, R. & Abustan., 1998. Issues and practices in designing a holistic flood risk mapping system. National Civil Engineering Conference (Awam ’99), Perak, Malaysia.
5. Ab.Ghani, A., Abu Hasan, Abdullah, R., Zakaria, N.A., Mohd. Sidek, L., Abustan. I. &Adlan, M.N., 1999. Cross-sectional changes in Pari River after completion of a flood mitigation project. National conference on water, forestry and landuse perspectives, Kuala Lumpur, Malaysia.