1. Estimating project S-curves using polynomial function and neural networks;Chao;J. Construct. Eng. Manag.,2009
2. Comparing the Productivity of Major Shipyards in China, South Korea, and Japan–an Application of a Metafrontier Framework;Chao,2020
3. DHSS expenditure forecasting method;Hudson;Chartered Surveyor–Building and Quantity Surveying Quarterly,1978
4. Integration of long-term planning and mid-term scheduling of shipbuilding;Ju;Prod. Plann. Control,2021
5. A model for a simulation-based shipbuilding system in a shipyard manufacturing process;Kim;Int. J. Comput. Integrated Manuf.,2005