Author:
Dan Yiran,Liu Guiwen,Mao Chao,Li Kaijian,Xu Pengpeng
Subject
Electrical and Electronic Engineering,Artificial Intelligence,Control and Systems Engineering
Reference47 articles.
1. Scheduling cost optimization and neural dynamics model for construction;Adeli;J. Construct. Eng. Manag.,1997
2. Lean approach in precast concrete component production;Ahmad;Built. Environ. Proj. Asset. Manag.,2019
3. Simulation-based optimisation using simulated annealing for crew allocation in the precast industry;Al-Bazi;Architect. Eng. Des. Manag.,2018
4. Optimal process integration architectures in off-site construction: theorizing the use of multi-skilled resources;Arashpour;Architect. Eng. Des. Manag.,2018
5. Evaluation of fire performance of prefabricated concrete buildings in Turkey;Arslan;Mag. Concr. Res.,2017
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献