Author:
Pan Nai-Hsin,Hsaio Po-Wen,Chen Kuei-Yen
Subject
Electrical and Electronic Engineering,Artificial Intelligence,Control and Systems Engineering
Reference24 articles.
1. Al-Turki, U., Fedjki, C., Andijani, A., 2001. Tabu Search method for a class of single-machine scheduling problems. Computers and Operations Research 28(12), 1223–1230.
2. Some efficient multi-heuristic procedures for resource-constrained project scheduling;Boctor;European Journal of Operational Research,1990
3. Construction resource scheduling with genetic algorithms;Chan;Journal of Construction Engineering and Management, ASCE,1996
4. Project scheduling under resource constraints: historical review and categorization of procedures;Davis;AIIE Transactions,1973
5. A comparison of heuristic and optimum solutions in resource-constrained project scheduling;Davis;Management Science,1975
Cited by
33 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献