1. Virtual engineering approaches in product and process design;Cecil;Int. J. Adv. Manuf. Technol.,2007
2. Cesta, A., Finzi, A., Fratini, S., Orlandini, A., Tronci, E., 2008. Validation and verification issues in a timeline-based planning system. In: Proceedings of the International Conference on Automated Planning and Scheduling (ICAPS) Workshop on Knowledge Engineering for Planning and Scheduling (KEPS). Sydney, Autralia.
3. Coles, A., Fox, M., Long, D., Smith, A., 2008. A hybrid relaxed planning Graph’LP heuristic for numeric planning domains. In: Rintanen, J., Nebel, B., Beck, J.C., Hansen, E.A. (Eds.), Proceedings of the International Conference on Automated Planning and Scheduling (ICAPS), pp. 52–59.
4. LPRPG-P;Coles,2011
5. Cresswell, S., Fox, M., Long, D., 2002. Extending TIM domain analysis to handle ADL constructs. In: Knowledge Engineering Tools and Techniques for AI Planning: AIPS'02 Workshop, Toulouse, France.