1. Agre, P.E., 1988. The dynamic structure of everyday life. Ph.D. Thesis, Massachusetts Institute of Technology Cambridge (MIT) Artificial Intelligence Lab.
2. Aissani, N., Trentesaux, D., Beldjilali, B., 2008. Efficient and effective reactive scheduling of manufacturing system using SARSA-multi-objective-agents. In: Lamouri, S.Et., Thomas, A., Artiba, A.Et., Vernadat, F. (Eds.), MOSIM’08: Seventh International Conference on Modelisation & Simulation. Tec&Doc, Lavoisier, pp. 698–707.
3. Agent-based control of manufacturing processes;Albadawi;International Journal of Manufacturing Research (IJMR),2006
4. Optimal preventive maintenance policies;Barlow;Operations Research Journal,1960
5. Bidot, J., Vidal, T., Laborie, P., Beck, J.C., 2007. A general framework for scheduling in a stochastic environment. In: Proceedings of the International Joint Conference on Artificial Intelligence IJICAI07, pp. 56–61.