1. Development and Demonstration of a Fault Current Limiting HTS Cable to be Installed in the Con Edison Grid
2. Scale-up of 2G wire manufacturing at American Superconductor Corporation
3. M. Rupich, J. McCall, C. Thieme, “R&D for High Performance 2G HTS Wire for Commercial Readiness,” US Department of Energy Advanced Cables and Conductors Program Peer Review, Alexandria, Virginia, June 29–July 1, 2010. .
4. B. Gamble, S. Ahmed, “Development and In-Grid Demonstration of a Transmission Voltage SuperLimiter™ Fault Current Limiter,” US Department of Energy Advanced Cables and Conductors Program Peer Review, Alexandria, Virginia, June 29–July 1, 2010. .
5. J. Maguire, F. Schmidt, S. Bratt, T. Welsh, “LIPA 2 Cable Project, US Department of Energy Advanced Cables and Conductors,” US Department of Energy Advanced Cables and Conductors Program Peer Review, Alexandria, Virginia, June 29–July 1, 2010. .