1. Reliability Evaluation of Power System;Billinton,1996
2. R.M. Burns, C.A. Gibson, Optimization of priority lists for a unit commitment program, in: Proceedings of IEEE PES (Summer Meeting), Paper A 75, 1975, pp. 453–461.
3. Firefly algorithm for reliable/emission/economic dispatch multi-objective problem;Chandrasekaran;International Review of Electrical Engineering (IREE),2012
4. Branch-and-bound scheduling for thermal generating units;Chen;IEEE Transaction Energy Conversion,1993
5. Nodal ant colony optimization for solving profit based unit commitment problem for GENCOs;Christopher Columbus;Applied Soft Computing,2012