Subject
Industrial and Manufacturing Engineering,Metals and Alloys,Computer Science Applications,Modeling and Simulation,Ceramics and Composites
Reference16 articles.
1. Flowshop/no-idle or no-wait scheduling to minimise the sum of completion times;Adiri;Naval Res. Logistic Quart.,1982
2. E. Bertolissi, A simple no-wait flow-shop scheduling heuristic for the no-wait flowshop problem, in: Proceedings of the 15th International Conference on Computer-Aided Production Engineering, CAPE’99, Durham, UK, April 19–21, 1999.
3. Solutions to the constrained flow-shop sequencing problem;Bonney;Oper. Res. Quart.,1976
4. Design of a scheduling system for flexible manufacturing cells;Chan;Int. J. Prod. Res.,1990
5. An evaluation of flow shop sequencing heuristics;Dannenbring;Mgmt. Sci.,1977
Cited by
62 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献