Author:
Chang Young K.,Kim Hongrae,Kang Jin S.
Funder
Defense Acquisition Program Administration
Green Science Research Center
Agency for Defense Development
Reference15 articles.
1. J.R. Wertz, Reducing Space Mission, Space Technology Library, El Segundo, 1999.
2. H. Habib-Agahi, J. Mrozinski, G. Fox, NASA Instrument Cost/Schedule Model, in: Aerospace Conference Proceedings, IEEE, 5–12 March 2011.
3. Space Mission Engineering: The New SMAD;Wertz,2011
4. A complexity-based risk assessment of low-cost planetary missions: when is a mission too fast and too cheap?;Bearden;Acta Astronaut.,2003
5. C.R. Joyner II, J.R. Laurie, D.J.H. Levack, E. Zapata, Pros, Cons, and Alternatives to Weight Based Cost Estimating, 47th AIAA/ASME/SAE/ASEE Joint Propulsion Conference, San Diego, 31 July–3 Aug 2011.
Cited by
5 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献