Author:
LIANG Jinzhong,GUAN Wenlong,JIANG Youwei,XI Changfeng,WANG Bojun,LI Xiaoling
Subject
Economic Geology,Geochemistry and Petrology,Geology,Energy Engineering and Power Technology,Geotechnical Engineering and Engineering Geology
Reference16 articles.
1. In situ combustion (ISC) process using horizontal wells;Greaves;Journal of Canadian Petroleum Technology,1996
2. Greaves M, Ren S R, Xia T X. New air injection technology for IOR operations in light and heavy oil reservoirs. SPE 57295, 1999.
3. Greaves M, Xia T X, Ayasse C. Underground upgrading of heavy oil using THAI “Toe-to-Heel Air Injection”. SPE 97728, 2005.
4. Xia T X, Greaves M, Turta A T. Injection well-producer well combinations in THAI “Toe-to-Heel Air Injection”. SPE 75137, 2002.
5. Toe-to-Heel Air Injection new method of EOR;Li;Journal of Southwest Petroleum University: Science & Technology Edition,2008
Cited by
32 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献