1. New technology for Improving the Effect of Waterflooding at High Water Cut Period;GANG,1999
2. Technical and economic limits for the development of high water cut Oilfields;CHANG;Petroleum Exploration and Development,2005
3. Layer subdivision in the late high water cut stage in the complex fault block reservoirs, Dongxin Oilfield;WANG;Petroleum Exploration and Development,2004
4. Variation of physical characteristics and wettability of the reservoir at high water-cut stage;ZHU;Petroleum Exploration and Development,2004
5. Oil viscosity variation and its effects on production performance in water drive reservoir;JU;Petroleum Exploration and Development,2006