Author:
Matt Dominik T.,Dallasega Patrick,Rauch Erwin
Reference34 articles.
1. Browne J, Harren J, Shivan J. Production Management Systems. An integrated perspective. Harlow: Addison-Wesley; 1996.
2. Portioli-Staudacher A, Tantardini M. A lean-based ORR system for non- repetitive manufacturing. International Journal of Production Research 2012;50:12-3257-3273.
3. Bertrand JWM, Muntslag DR. Production control in engineer-to-order firms. International Journal of Production Economics 1993;30-3-22.
4. Gidado KI. Project complexity: The focal point of construction production planning. Construction Management & Economics 1996;14:3-213-225.
5. Ballard G, Arbulu R. Making prefabrication lean. In: Bertelsen S, Formoso, CT, editors. Proc. 12 th Ann. Conf. of the Int’l. Group for Lean Constr. Copenhagen: Lean Construction, 2004. p. 3-5.,
Cited by
25 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献