Author:
Knollmann Mathias,Windt Katja,Duffie Neil
Reference21 articles.
1. Nyhuis, P., H.-P. Wiendahl, 2009, Fundamentals of Production Logistics: Theory, Tools and Applications, Springer.
2. Zipkin, P.H., 1986, Models for Design and Control of Stochastic, Multi- Item Batch Production Systems, Oper. Res. 34:91-104.
3. Erlebacher, S.J., M.R. Singh, 1999, Optimal Variance Structures and Performance Improvement of Synchronous Assembly Lines, Oper. 47:601-618.
4. Knollmann, M., K. Windt, 2013, Control-Theoretic Analysis of the Lead Time Syndrome and its Impact on the Logistic Target Achievement, in: Procedia CIRP, Vol. 7, 46th CIRP Conf. Manuf. Syst. (CMS 2013):97-102.
5. Mather, H., G. Plossl, 1977, Priority fixation versus throughput planning, Prod. Invent. Manag. J. Am. Prod. Invent. Control Soc. APICS. 3rd Q.:27-51.
Cited by
9 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献