Author:
Kern Wolfgang,Rusitschka Fabian,Bauernhansl Thomas
Reference18 articles.
1. Holweg M, Pil FK. The second century – Reconnecting customer and value chain through build-to-order. Moving beyond mass and lean production in the auto industry. 1st ed. Cambridge: MIT Press; 2004.
2. Hu SJ, Ko J, Weyand L, ElMaraghy HA, Lien TK, Koren Y, Bley H, Chryssolouris G, Nasr N, Shpitalni M. Assembly system design and operations for product variety. CIRP Annals – Manufacturing Technology 2011; 60: p. 715-733.
3. Wiendahl HP, Reichardt J, Nyhuis P. Handbook factory planning and design. Berlin, Heidelberg: Springer; 2015.
4. Westkämper E, Zahn E. Wandlungsfähige Produktionsunternehmen – Das Stuttgarter Unternehmensmodell. (Changeable manufacturing enterprises – The Stuttgart Enterprise Model). 1st ed. Berlin: Springer; 2009.
5. Waltl H, Wildemann H. Modularisierung der Produktion in der Automobilindustrie (Modularization of production in the automotive industry). 1st ed. München: TCW., Verlag, 2014.,
Cited by
22 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献