1. Integrating the Supply Chain;Stevens;International Journal of Physical Distribution & Logistics Management,1989
2. Cranfield (2013), AUTONOM – Integrated through-life support for high-value systems, available at: http://www.cranfield.ac.uk/research/research-activity/current-projects/research-projects/autonom.html (accessed July/8).
3. Network Rail, (2014), Network Rail's activity and expenditure plans: This section sets out our forecasts of activity and expenditure for the remainder of CP4, for CP5 and beyond. It covers:–Maintenance activity and expenditure, 0.14th ed., Network Rail, Network Rail.
4. Performance indicators and terminology for value driven maintenance;Stenström;Journal of Quality in Maintenance Engineering,2013
5. Pantograph/Catenary Dynamics and Control;Poetsch;Vehicle System Dynamics: International Journal of Vehicle Mechanics and Mobility,2007