Author:
Trabesinger Stefan,Pichler Rudolf,Pichler Michael,Payerl Florian,Lenz Constant,Höffernig Martin,Ettinger Andreas
Reference37 articles.
1. Agile Assembly System by “Plug and Produce”;Arai;CIRP Annals,2000
2. A. Jain, D. A. Vera, R. Harrison, Virtual Commissioning of Modular Automation Systems, 10th IFAC Workshop on Intelligent Manufacturing Systems, IFAC Proceedings Volumes, 43 (4) (2010) 72 – 77.
3. Forschungsraum smartfactory@tugraz – Die Sichtbarmachung einer agilen Fertigung;Pichler;WINGbusiness,2017
4. Y. Samant, M. Falk, P. Mattila-Wiro, S. Bye, O. F. Vargas, X. B. Irastorza, N. Leppink, 1757 future of work and occupational safety and health: an oversight of the nordic future of work and osh report, 2018.
5. Allgemeine Unfallversicherungsanstalt (AUVA), Umbau von Maschinen (2016). Available from: https://www.auva.at/cdscontent/load? contentid=10008.544785&version=1524648038.