Author:
Münker Sören,Göppert Amon,Schmitt Robert H.
Funder
Federal Ministry for Economy and Energy
Reference14 articles.
1. Directive 2006/66/ec of the european parliament and of the council of 6 september 2006 on batteries and accumulators and waste batteries and accumulators and repealing directive 91/157/eec. Directive;Official Journal of the European Union,2006
2. Development of a tuneable test problem generator for assembly sequence planning and assembly line balancing;Rashid;Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture,2012
3. Generation of assembly restrictions and evaluation of assembly criteria from 3d assembly models by collision analysis;Neb;Procedia CIRP,2021
4. Christos Gi-annoulis, Kostantinos Sipsas, Nikolaos Papakostas, and George Chryssolouris. An automated assembly process planning system;Bikas;Procedia CIRP,2016
5. A data-driven modeling approach for integrated disassembly planning and scheduling;Ehm;Journal of Remanufacturing,2019