Author:
May Marvin Carl,Behnen Lukas,Holzer Andrea,Kuhnle Andreas,Lanza Gisela
Reference34 articles.
1. Reinforcement learning for an intelligent and autonomous production control of complex job-shops under time constraints;Altenmüller;Production Engineering,2020
2. Optimization of re-entrant hybrid flows with multiple queue time constraints in batch processes of semiconductor manufacturing;Arima;IEEE Transactions on Semiconductor Manufacturing,2015
3. Bergstra, J., Bardenet, R., Bengio, Y., Kégl, B., 2011. Algorithms for hyper-parameter optimization, in: Proceedings of the 24th International Conference on Neural Information Processing Systems, Curran Associates Inc., Red Hook, NY, USA. p. 2546–2554.
4. Chang, C.Y., Chang, K.H., 2012. An integrated and improved dispatching approach to reduce cycle time of wet etch and furnace operations in semiconductor fabrication, in: Gao, L. (Ed.), IEEE 16th International Conference on Computer Supported Cooperative Work in Design (CSCWD), 2012, IEEE, Piscataway, NJ. pp. 734–741. doi:10.1109/CSCWD.2012. 6221901.
5. Calculating interval forecasts;Chatfield;Journal of Business & Economic Statistics,1993
Cited by
6 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献