Author:
Ali-Qureshi Zulfiqar,ElMaraghy Waguih H.
Reference16 articles.
1. Cochran, D.S., Arinez, J.F., Duda, J.W. & Linck, J. (2002). A decomposition Approach for Manufacturing System Design, Journal of Manufacturing Systems, 20(6), pp 371-389.
2. Gausemeier, J; Schäfer, W; Eckes, R; Wagner, R. (2005) Ramp-Up and Maintenance with Augmented Reality in Development of Flexible Production Control Systems, CARV 05, International Conference on Changeable, Agile, Reconfigurable and Virtual Production.
3. Ceglarek, D.; Huang, W., Zhou,S.; . Ding, Kumar, R (2004). The International Journal of Flexible Manufacturing Systems, 16, 11-44, 2004, Kluwer Academic Publishers. Netherlands.
4. Reinhart, G., Wünsch, G (2007) Economic application of virtual commissioning to mechatronic, production systems, Prod. Eng. Res.Devel. (2007) 1:371-379.
5. Gisela, L. (2012), Simulation of personnel requirements during production ramp-up, Production Engineering, v 6, n 4-5, p 395-402, September, 2012.
Cited by
5 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献