1. Aitken, S.A., 1990. The Pamour One mine-site investigation, Timmins, Ontario. Unpublished MSc thesis, Queen's University, Kingston, Ontario.
2. Timing relationships and structural controls on the location of Cu–Au mineralization at the Boddington gold mine, Western Australia;Allibone;Economic Geology,1998
3. Evolution of the southern Abitibi Greenstone Belt based on U–Pb geochronology: autochthonous volcanic construction followed by plutonism, regional deformation and sedimentation;Ayer;Precambrian Research,2002
4. New geochronological and Nd isotopic results from the Abitibi Greenstone Belt, with emphasis on timing and implications of late Archean sedimentation and volcanism;Ayer,2002
5. Overview of results from the greenstone architecture project: Discover Abitibi Initiative;Ayer,2005