Author:
Stoch B.,Basson I.J.,Gloyn-Jones J.N.,Lomberg K.G.
Subject
Economic Geology,Geochemistry and Petrology,Geology
Reference69 articles.
1. Taking the sting out of project start-up problems;Agarwal;Eng. Min. J.,1984
2. Allibone, A.H., Campbell McCuaig, T., Harris, D., Etheridge, M., Munroe, S., Byrne, D., Amanor, J. and Gyapong, W., (2002). Structural Controls on Gold Mineralization at the Ashanti Deposit, Obuasi, Ghana, Integrated Methods for Discovery: Global Exploration in the Twenty-First Century, Eds: Richard J. Goldfarb, Richard L. Nielsen.
3. Aug, C., Chiles, J.-P., Courrioux, G., and Lajaunie, C. (2005). 3D geological modelling and uncertainty: The potential-field method. In Leuangthong, O. and Deutsch, C. (Eds.), Geostatistics Banff 2004 (31), 145–154.
4. Berry, M.V. and Quigley M.L. (2004). Mining Geology 2004 Workshop, Bulletin 41, pp 92.
5. Structural analysis of drill core for mineral exploration and mining: review and workflow toward domain-based 3-D interpretation;Bernhard;Rev. Econ. Geol.,2020
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献