1. Anonymous. (1996). 126m long Spanish fast ferry launched. Fast Ferries, September, 19–20.
2. Anonymous. (1998). Silvia Ana: Results of first year's service. Ship & Boat Int., January, 15–16.
3. Aranda, J., de la Cruz, J. M., Dı́az, J. M., & Dormido Canto, S. (2002a). QFT versus classical gain scheduling: Study for a fast ferry. Proceedings of the control 15th IFAC world congress 2002, Barcelona, Spain.
4. Aranda, J., Muñoz, R., & Dı́az, J. M. (2002c). Comparison of the vertical dynamics models of a fast ferry with actuators and without actuators. Proceedings of the third international congress on maritime technological innovations and research 2002, Bilbao, Spain.
5. Aranda, J., Revilla, J., Dı́az, J. M., & Ruipérez, P. (2002b). Experimental and robustness analysis of a multivariable control for vertical dynamic of a high speed craft. Proceedings of the IEEE conference on control applications 2002, Glasgow.