Author:
Jiang Yishuo,Li Ming,Guo Daqiang,Wu Wei,Zhong Ray Y.,Huang George Q.
Subject
General Engineering,General Computer Science
Reference58 articles.
1. Large-scale 3D printing with a cable-suspended robot;Barnett;Addit. Manuf.,2015
2. E.L.R. Beckera, J. Martensa, R. Wollenberga, H. Zhangb, S. Brell-Cokcanb, J. BlankenbachaEnabling BIM for Property Management of Existing Building Based on Automated As-is Capturing.pdf, 2019.
3. Towards a semantic construction digital twin: directions for future research;Boje;Autom. Constr.,2020
4. A proactive system for real-time safety management in construction sites;Carbonari;Autom. Constr.,2011
5. Bridging BIM and building: from a literature review to an integrated conceptual framework;Chen;Int. J. Proj. Manag.,2015
Cited by
90 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献