Subject
Information Systems and Management,Management Science and Operations Research,Modeling and Simulation,General Computer Science,Industrial and Manufacturing Engineering
Reference37 articles.
1. Alvarez-Valdez, R., Tamarit, J.M., 1989. Heuristic algorithms for resource-constrained project scheduling: A review and an empirical analysis. In: Slowinski, R., Weglarz, J. (Eds.), Advances in Project Scheduling. Elsevier, Amsterdam, pp. 113–134
2. Industrial Systems: Planning, Analysis, Control;Bedworth,1973
3. Some efficient multi-heuristic procedures for resource-constrained project scheduling;Boctor;European Journal of Operational Research,1990
4. Brand, J.D., Meyer, W.L., Shaffer, L.R., 1964. The resource scheduling method for construction. Civil Engineering Studies Report No. 5, University of Illinois
5. Brooks, G.H., White, C.R., 1965. An algorithm for finding optimal or near optimal solutions to the production scheduling problem. Journal of Industrial Engineering, January–February, 34–40
Cited by
73 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献